Energia-alan teknologinen kehitys ja sijoitusmahdollisuudet

Vaikuttaa hyvältä hankinnalta ja juuri huomasin, että ilmeisesti tänään tulossa lisätietoja kahdesta muusta hankinnasta:

Xebec has also executed a non-binding letter of intent to acquire a leading industrial gas generation technology and manufacturing business, as well as a non-binding letter of intent to acquire a specialty compressed air and air treatment services company (together, the “LOI Acquisitions”). The aggregate purchase price for the LOI Acquisitions (excluding closing costs) is anticipated to be between $35 million and $60 million. As of the date hereof, the parties are in advanced stages of negotiation and it is anticipated that the definitive purchase agreements with respect to the LOI Acquisitions are likely to be executed by the parties in the near term.

While there can be no assurance that the LOI Acquisitions will become subject to binding purchase agreements, Xebec currently expects the transactions to proceed and is announcing today the LOI Acquisitions as it intends to use a small portion of the net proceeds of the Offering to satisfy the purchase price (or a portion thereof) for each of the LOI Acquisitions.

1 tykkäys

Agilyx Signs Agreement with A.Eon

Converting Mixed Waste Plastics to Generate Electricity

3 tykkäystä

https://www.kauppalehti.fi/uutiset/seuraavan-sukupolven-vetyauto-myyntiin-toimintamatka-yli-600-kilometria/7d5c17d2-2169-4fc4-803f-b0f2887c8171

8 tykkäystä

Ootte jutellut Bosch ja lennoista, mutta ei pahemmin ceresistä. Piti olla linkki tähän, mutta akku sammui. mutta kannattaa ehkä vilkaista.

Azelio reaches major milestone by winning its first commercial order from Dubai

Azelio wins a first commercial order for its long-duration energy storage from ALEC Energy, thereby achieving a major milestone for the company. The storage unit will be part of a system in the fourth phase of one of the world’s largest solar parks, the Mohammed Bin Rashid Al Maktoum Solar Complex in Dubai.

This strategically important order is placed on commercial terms, reflecting that it is for a single unit. Azelio’s energy storage TES.POD® will be part of a system powering a visitor center at the phase IV of the Mohammed bin Rashid Al Maktoum (MBR) Solar Complex. The system will combine Azelio’s technology with PV and fast-response equipment such as state-of-the-art li-ion batteries. Azelio’s TES.POD® will handle energy shifting for baseload power in the system, while batteries will be used to manage mini-grid stability.

The MBR Solar Complex is spread over a total area of 77 square kilometers in Dubai. Noor Energy 1, a company owned by Dubai Electricity & Water Authority (DEWA), ACWA Power and Silk Road Fund, is currently developing 950 MW of solar energy technology (phase IV) in the solar park. By 2030, the capacity in the MBR Solar Complex is planned to amount to 5,000 MW.

The order for the storage unit has been placed to Azelio by ALEC Energy, who is the lead EPC contractor of the project.

“This is a major milestone for Azelio and we are thrilled to achieve it together with ALEC Energy. Being present in the world leading MBR Solar Complex allows us to showcase our solution to important audiences and demonstrate how our long-duration energy storage can make solar power available around the clock in an affordable way,” says Azelio’s CEO Jonas Eklind.

“Long-duration energy storage is a vital component in the transition from fossil to renewable energy and a key to provide clean and secure energy 24 hours a day. ALEC Energy is proud to pioneer Azelio’s technology in this system,” says ALEC Energy’s General Manager James Stewart.

Azelio and ALEC Energy recently signed a Memorandum of Understanding covering 49 MW installed capacity of Azelio’s storage units, starting with a smaller commercial project. ALEC Energy is also installing Azelio’s verification project in Abu Dhabi together with Masdar and Khalifa University.

Vaihteeksi 10% plussaa!

5 tykkäystä

Ja tämä postattu Azelio-ketjuunkin: :slightly_smiling_face:

3 tykkäystä

Mikähän firma tekee polttokennot? Vai Toyota ite?

1 tykkäys

https://au.finance.yahoo.com/news/ceres-power-holdings-plc-bosch-082700747.html tässä se linkki tuohon Ceres uutiseen, eli ilmeisesti Bosch tekee kennoja ja omistaa 18%.

3 tykkäystä

Tällainen alkamassa vartin päästä:

Ilmoittautua voi täällä.

E: Aikamoista numeroita energiankulutuksessa (myynnissä) USAssa YoY. Commercial -6.6 ja industrial -9.2 %. Revenuet kovilla.

5 tykkäystä

Onko UGE kukaan tutustunut? Taas yksi tapaus Kanadasta, kummelit oikeassa!

5 tykkäystä

https://research.fearnleysecurities.no/Hydrogen/

No nyt vaikuttaa mielenkiintoiselta. Täytyypi tutustua.

2 tykkäystä

Tällainen julkaisu tuli vastaan

Paska ja epämääräinen linkki, mutta Acent Hydrogen fundin kuukausikatsaus.

Ei nyt ihan kauheasti vakuuta, jos AFC Energy on sekä top 5 että bottom 5. Ihan kivoja uutisia oli kertaukseksi ja jos jotain oli mennyt ohi.

1 tykkäys
11 tykkäystä

‘island mode’ lle iso peukku allekirjoittaneelta

6 tykkäystä

https://twitter.com/DaimlerTruckBus/status/1336961528914989057?s=19

Edit: @viljo Linde omistaa siivun ITM Powerista.

6 tykkäystä

Örsti & Amazon

6 tykkäystä

https://www.petroleum-economist.com/articles/low-carbon-energy/energy-transition/2020/northern-netherlands-sets-hydrogen-blueprint-for-eu

" More than 50 hydrogen projects are in development and—with state help—the regional group wants to show the rest of Europe how to develop a hydrogen hub"

1 tykkäys

Olikos se linde omistamassa itm vai mcphy? Varmaan itm?